Artificial intelligent assistant

Please explain how to erect a mobile scaffold

in this video we will be demonstrating the procedure for assembling a mobile scaffold tower begin by checking the wheel Castor's and adjusting the leveling Heights into the bottom most positions after finding your position insert the casters into the base frames before locking the wheel brakes next to touch the locking bar from the scaffold braces and stand up the base frame in order to secure the yellow horizontal brace to the upright frame just about the first run with the snap lock facing inward add a second horizontal brace and stand up the opposite base end frame install the bread plan brace to the diagonally opposite uprights and check that the scaffold base is squared level the base and both the horizontal and vertical directions by adjusting the casters with the spirit level accuracy further install the yellow horizontal braces in order to stabilize the frames we still the next end frames on top of each of the two base names install the two blue diagonal braces both above and below the joining points opposite directions install one temporary platform approximately one meter from the ground between both end times erect the access platform at a one meter interval above the temporary platform on the opposite side this is part of the first working platform and will act as a fall prevention install the access ladder through the opening section of the working platform erect yellow horizontal braces as guardrails and middle rails for the working platform while standing on the temporary platform remove the temporary platform and place it above to complete a working platform a working platform should not include the ladder access platform and access ladder if working height exceeds 3.5 meters outriggers must be fitted for all 0.7 wired towers above 2 meters outriggers must be fitted to the tower if outriggers are not used then the tower is to be stabilized by installing tires to a suitable structure repeat the process from before installing working platforms at intervals of two minutes when done simply reverse the assembly process step by step making sure to maintain safety standards finally repackage the scaffold into the original state ready for transportation or for using scaffold it must be checked to make sure that it is built correctly and stands medically to hire this machine and many more visit the team install at smart hire

xcX3v84RxoQ-4GxG32940ukFUIEgYdPy d0a07354d136097eae17b0ff0bdfe4a3